Bridging the Gap 8.+9.8.
In the framework of the Wiener Ferienspiel (from the age of 6)
Arch bridges, chain bridges, suspension bridges, hanging bridges, cable stayed bridges, pontoons or human chains – the children found out…
Workshop
In the framework of the Wiener Ferienspiel (from the age of 6)
Arch bridges, chain bridges, suspension bridges, hanging bridges, cable stayed bridges, pontoons or human chains – the children found out more about the construction and history of these key feats of civil engineering at the Architekturzentrum Wien. Equipped with tape measure, spirit level and other tools we built our own bridge on a scale of 1:1. We tested its load bearing capacity over water – nobody got wet!
Mon+Tues, 5.+6.8.2013
Thurs+Fri, 8.+9.8.2013
Mon+Tues, 12.+13.8.2013
Mon+Tues, 19.+20.8.2013
Thurs+Fri, 22.+23.8.2013
Mon+Tues, 26.+27.8.2013
10am – 2pm, please bring a packed lunch!
Reservations required: T +43 1 522 31-15 or office@azw.at